1985.04.20~2026.08.21 Goodbye, Chang-dong Depot~
Address 573 Nowon-ro, Nowon-gu, Seoul Opening Date April 20, 1985 Closing Date August 21, 2026 This was the rolling stock depot for Seoul Subway Line 4, located at 573 Nowon-ro, Nowon-gu, Seoul. It is the first rolling stock depot among urban railway lines in South Korea to be closed. Chang-dong Depot was a railway depot belonging to Seoul Metro, responsible for the entry, exit, and light maintenance inspection management of Seoul Metro Class 4000 VVVF electric trains operating on Seoul Subway Line 4. It also handled overnight stabling for KORAIL Class 341000 electric trains. However, due to the lack of heavy maintenance facilities at Chang-dong Depot, heavy maintenance was conducted at Jichuk Depot on Seoul Subway Line 3. In addition to heavy maintenance, various component replacements, such as the element replacement for the old AC/DC Daewoo-built trains, were also performed at Jichuk Depot. Despite being named Chang-dong Depot, it was actually located in Sanggye-dong, Nowon-gu, rather than Chang-dong, Dobong-gu. There is no separate subway station installed within the depot; instead, tracks branch off and connect toward Chang-dong Station and Nowon Station from the south of the base. Most departing trains are deadheaded to Bulamsan Station to begin service. However, the first train for Oido departing from Nowon on weekdays and the first train for Sadang departing from Nowon on weekends and holidays enter the southbound platform directly and depart at 5:30 AM. There are also several trains for Sadang that enter Chang-dong Station directly to start service during the 5:00–8:00 AM window on weekdays. For incoming trains, they operate to Bulamsan Station on weekdays before turning back and passing through Sanggye and Nowon stations without stopping. For weekend and holiday trains from Oido, they operate as bound for Nowon, terminate at Nowon Station, and then enter the depot. Until the early 2000s, many trains terminated at Nowon before entering the depot, using the X-shaped crossover to enter the southbound platform and then heading straight into the depot. This is why a 10-car stop position sign remains at the end of the southbound track at Nowon Station toward Sanggye Station. When Line 4 first opened, there was only a double-track connection toward Nowon Station, but a single-track connection to Chang-dong Station opened in 1992. In the past, a freight line connecting Gyeongwon Line's Chang-dong Station to the Dong-ah Construction and Ssangyong Cement factories extended to the west of Chang-dong Depot, passing through Jungnangcheon Stream and the Dongbu Expressway. This line was used to bring in the old Seoul Subway Line 4 Class 4000 and Line 3 Class 3000 vehicles. The connection was removed after Dong-ah Construction moved in June 1993 and Ssangyong Cement moved in July 1994, followed by apartment construction and the completion of the Gwacheon Line, which allowed for train delivery via the new tracks. However, traces of the connection can still be seen through the access control iron gates between the Dongbu Expressway and Jungnangcheon, track remnants at the Chang-dong Stadium intersection near Ssangyong Apartments, and the entrance site of the connection line on the west side of Chang-dong Depot. In particular, if you look closely at the Chang-dong Stadium intersection, subtle cracks still show the shape of the tracks today; this is because the tracks were paved over rather than removed, and as layers were added over time, the sections where the tracks lay began to resurface. Because Chang-dong Depot occupied prime real estate near Nowon Station for a long time, it was identified by Nowon-gu as a primary culprit hindering regional development. While the area was an empty field when the depot first opened, it became surrounded by numerous apartment complexes over time. Consequently, Nowon-gu repeatedly pushed for its relocation, which was eventually confirmed. There are plans to establish the Seoul Bio-Medical Cluster on this site. Since Nowon-gu residents took pride in being the "8th School District of Gangbuk" but lacked infrastructure outside of private academies and entertainment districts, the residents generally welcomed the move. When the railway depot was first built, the surroundings were empty fields on the outskirts of northeastern Seoul. However, since the late 1980s, massive apartment development centered around Dongil-ro transformed the area, making the Nowon Station vicinity a core hub of northeastern Seoul. Residents argued that despite having a population of 500,000, Nowon-gu could not host proper cultural or business facilities because the railway depot occupied the very center of the region. They claimed the district had turned into a massive bed town and that Chang-dong Depot had become a nuisance blocking regional growth. Thus, residents had been calling for its relocation since the 1990s, encouraging the move so that the 54,000-pyeong site could be used for cultural and convenience facilities. After many twists and turns, construction on the Jinjeop Line began in 2014, and the site for Jinjeop Depot, which would replace Chang-dong Depot, was confirmed in 2016. Chang-dong Depot eventually handed over its functions to Jinjeop Depot and was closed. Although the Jinjeop Line opened on March 19, 2022, the completion of Jinjeop Depot was delayed slightly beyond the line's completion, resulting in Chang-dong Depot remaining in operation for over four years after the Jinjeop Line opened.
On the final day of Chang-dong Depot, the trains pull out one by one. They will never return to Chang-dong Depot again.
Release Date 2026.10.04 / Last Updated 2026.10.04